Referenzprojekte Wasserkraftwerksbau
Reference Projects
Karlovac (CH)
Year: June 2011
Jacking length: 195m
Smallest curve radius: 150m
Nom. dia. DN: 1600mm
Pipe length: 2500mm
Kraftwerk Ziegelbrücke
(GL/CH)
Year: 2010 / 2011
Costs SFR 8.8 Mio
Gross head: 8.4 m
Inst. capacity: 600kW
Turbine type: Kaplan
Pipe Jacking/Microtunneling
Hydroelectric Power Plant Construction
For detailed information and further reference projects click on the photos
Jacking length
Main Menu
Home
About us
Services & Products
Research & Development
Download
References
News
Media
Jobs
Last changes
References
News
Jobs
Jackcontrol®: The Principle
Research & Development
Erneuerung Kraftwerk Mühlefuhr, Ennenda (GL)
Construction period
2008 - 2010
Capacity
22 m
3
/s
Costs
CHF 9.8 Mio
Installed capacity
0.75 MW
Gross head
4.8 m
Turbine type
Kaplan (5 loops)
Activities of Jackcontrol Ltd:
Overall project management; preliminary planning and design and final construction project including site management for intake, sediment trap, penstock, power house, tailrace.
Neubau Kraftwerk Mühlebach (Engi/GL)
Construction period
2008 - 2009
Capacity
1.1 m
3
/s
Costs
CHF 12 Mio
Installed capacity
3.6 MW
Gross head
360 m
Turbine type
Pelton (5 nozzles)
Activities of Jackcontrol Ltd
:
Final construction project including site management for intake, sediment trap, penstock, power house, outlet structure.
Erneuerung Linthkraftwerk Hefti AG, Hätzingen (GL)
Construction period
2006 - 2007
Capacity
9.6 m
3
/s
Costs
CHF 9.5 Mio
Installed capacity
1.1 MW
Gross head
15.4 m
Turbine type
Kaplan (5 loops)
Activities of Jackcontrol Ltd
:
Overall project management; preliminary planning and design and final construction project including site management for intake, headrace, penstock, power house, tailrace.