Reference Projects
Karlovac   Karlovac (CH)
Year: June 2011
Jacking length: 195m
Smallest curve radius: 150m
Nom. dia. DN: 1600mm
Pipe length: 2500mm
Kraftwerk Ziegelbrücke
Kraftwerk Ziegelbrücke (GL/CH)
Year: 2010 / 2011
Costs SFR 8.8 Mio
Gross head: 8.4 m
Inst. capacity: 600kW
Turbine type: Kaplan
Pipe Jacking/Microtunneling
Hydroelectric Power Plant Construction
For detailed information and further reference projects click on the photos
Jacking length
Draughtsman / Designer (also part-time possible) 02.12.2010

We are a young, internationally-active engineering company with headquarters in Glarus/Switzerland. We are mainly engaged in hydroelectric power plant construction and Pipe Jacking/Microtunneling. In addition, we are involved in structural engineering, cable car construction and bridge engineering. To strengthen our team wer are looking for a self-reliant, experienced Draughtsman / Designer to start on 01.03.2012 or by agreement at a later date.

The field of activities includes:

  • Design of reinforced concrete and steel structures, civil engineering / special foundations and power plant construction (CAD/Allplot/Allplan)
  • Construction of structures and structural components
  • If suitable and interested the function of site manager and operator for electronic measuring systems

Fulfilling the above tasks requires a solid professional knowledge, flexibility, self-reliant and exact work in a team as well as a conscientious approach. Also necessary is an agreeable manner in dealing with clients. Fluency desirable in the following foreign languages (English French, Italian). We are offering a very diversified position in a market with great growth potential, challenging problems with a commensurate salary as well as a harmonious working climate in a young team. If you feel this is the job for you, we would be glad to receive your written application to be sent to Dr. Stefan Trümpi-Althaus.