Reference Projects
Karlovac   Karlovac (CH)
Year: June 2011
Jacking length: 195m
Smallest curve radius: 150m
Nom. dia. DN: 1600mm
Pipe length: 2500mm
Kraftwerk Ziegelbrücke
Kraftwerk Ziegelbrücke (GL/CH)
Year: 2010 / 2011
Costs SFR 8.8 Mio
Gross head: 8.4 m
Inst. capacity: 600kW
Turbine type: Kaplan
Pipe Jacking/Microtunneling
Hydroelectric Power Plant Construction
For detailed information and further reference projects click on the photos
Jacking length
Jackcontrol develops and markets systems for the optimization and quality assurance of construction methods for microtunneling and underground pipe jacking that do without the need for digging trenches. Based on the research results obtained at the Swiss Federal Institute of Technology, Zurich, together with the firm's own current research work, various products and services are being developed, which as far as possible use existing pipe jacking equipment that ensure safe execution and quality assurance of the construction method and extend the range of application.

Read more...

 
Jackcontrol's section dealing with the construction of hydroelectric power plants is concerned with the design of small to medium-size hydropower plants in all phases of the project, both for new construction works and for the renewal of existing power plants. In the process, client-oriented solutions are provided from the initial planning and design to handing over the plant to the client, whereby most of the technical expertise involved in the construction of hydropower plants (hydrology, flood protection, hydraulics, design of hydraulic structures, geotechnical engineering, structural engineering, electro-mechanical equipment, etc.) is available within the firm.

Read more...