Home Services & Products Hydroelectric Power Plant Construction
buero1
Reference Projects
Karlovac   Karlovac (CH)
Year: June 2011
Jacking length: 195m
Smallest curve radius: 150m
Nom. dia. DN: 1600mm
Pipe length: 2500mm
Kraftwerk Ziegelbrücke
Kraftwerk Ziegelbrücke (GL/CH)
Year: 2010 / 2011
Costs SFR 8.8 Mio
Gross head: 8.4 m
Inst. capacity: 600kW
Turbine type: Kaplan
Pipe Jacking/Microtunneling
Hydroelectric Power Plant Construction
For detailed information and further reference projects click on the photos
Jacking length
Jackcontrol's section dealing with the construction of hydroelectric power plants is concerned with the design of small to medium-size hydropower plants in all phases of the project, both for new construction works and for the renewal of existing power plants. In the process, client-oriented solutions are provided from the initial planning and design to handing over the plant to the client, whereby most of the technical expertise involved in the construction of hydropower plants (hydrology, flood protection, hydraulics, design of hydraulic structures, geotechnical engineering, structural engineering, electro-mechanical equipment, etc.) is available within the firm.

The range of services includes:
  • Preliminary studies and project development
  • Consulting services to and representation of the client
  • Overall project management
  • Planning, design and execution of project
  • Site management and putting into service
  • Expert opinion and professional advice
  • Total contracting
As the operator of several hydropower plants Jackcontrol knows the client's needs first hand. .

altProspekt Wasserkraft
alt
Beispiele von ausgeführten Kraftwerken
altReferenzliste ausgewählter Projekte and download Referenzliste Wasserkraftwerksbau